Skip to page body Home The Ontario Plan E-Government Services Departments Public Officials About Ontario

Mechanical Permit Fees

Permit Issuance and Heaters

For the issuance of each mechanical permit $23.50
Minimum permit fee $23.50

Unit Fee Schedule
(Note: The following do not include permit-issuing fee.)
  1. Furnaces

    For the installation or relocation of each forced air or gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3kW) 14.80
    For the installation or relocation or each forced-air or gravity type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h (29.3kW) 18.20
    For the installation or relocation of each floor furnace, including vent 14.80
    For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater 14.80

  2. Appliance Vents

    For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit 7.25

  3. Repairs of Additions

    For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code 13.70

  4. Boilers, Compressors and Absorption Systems

    For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kW) or each absorption systemtoand including 100,000Btu/h (29.3 kW) 14.70
    For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kW) to and including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW) 27.15
    For the installation or relocation of each boiler or compressor over 15 horsepower (52.7 kW) to and including 30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.IkW) 37.25
    For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kW) to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) 55.45
    For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or each absorption systems over 1,750,000 Btu/h (512.9 kW) 92.65

  5. Air Handlers

    For receptacle, switch, light or other outlets at which current is used or controlled, except services, feeders and meters:

    For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719L/s), including ducts attached thereto 10.65
    Note: This fee does not apply a an air handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. For each air-handling unit over 10,000 cfm (4719 L/s 18.10

  6. Evaporative Coolers

    For each evaporative cooler other than portable type 10.65

  7. Ventilation and Exhaust

    For each ventilation fan connected to a single duct 7.25
    For each ventilation system which I not a portion of any heating or air-conditioning system authorized by a permit 10.65
    For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood 10.65

  8. Incinerators

    For the installation or relocation of each domestic-type incinerator 18.20
    For the installation or relocation of each commercial or industrial-type incinerator 14.50

  9. Miscellaneous

    For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which the fee is listed in the table 10.65

Other Inspections and Fees:

Inspections outside of normal business hours, per hour (minimum charge—three hours) $60.00
Reinspection fees $47.00
Inspections for which no fee is specifically indicated, per hour (minimum charge—one half hour) $47.00
Additional plan review require by changes, additions or revisions to plans or to plans for which an initial review has been completed (minimum charge—one-half hour) $70.00
Last updated: 11/11/2011 11:41:56 PM