The Official Website of Ontario, California
 
 
 
ENGINEERING
 
 
 
   
Home » Departments » Engineering » CIP » I-10 Grove Interchange and Corridor
 

I-10/Grove Interchange and Corridor

 

 

Project Study Report  p. 1 - 21p. 22 - 38, p. 39 - 60, p. 61 - 90, p. 91 - 110, p. 111 - 124, p. 125 - 133, p. 134 - 139, p. 140 - 161, p. 162 - 187, p. 188 - 223, p. 224 - 248, p. 249 - 266

 

Initial Site Assessment  p. 1 - 49 and p. 50 - 128

 

Addendum No. 1 to Initial Site Assessment

 

Preliminary Geotechnical Report

 

Preliminary Materials Report

 

Addendum No. 1 to Preliminary Materials Report

 

Preliminary Environmental Analysis Report (PEAR)  p. 1 - 34 and p. 35 - 69

 

Storm Water Data Report  p. 1 - 36 and p. 37 - 82

 

 

 

Note:  The file sizes range from 1MB to 9MB, please allow time for each file to download.

 
   
City of Ontario - Copyright 2008